Your Browser is not longer supported

Please use Google Chrome, Mozilla Firefox or Microsoft Edge to view the page correctly
Loading...

{{viewport.spaceProperty.prod}}

Process control

&pagelevel(3)&pagelevel

In the POSIX subsystem, a program is run in a process; in BS2000, by contrast, it is run in a task. In other words, if a program is called in the POSIX shell, a child process is spawned, but no process will be generated if it is called from the BS2000 command interface.