From the above explanations, the following recommendations can be deduced; they should be observed if high importance is placed on the accuracy of the data.
Minimization of marginal problems
The monitoring cycles should be long but not too long. Short-term peak loads will not be detected if the monitoring cycles are too.
All desired monitoring functions should be activated before (not during) the monitoring cycle.
Similarly, the desired monitoring functions should be kept active somewhat longer than the monitoring cycle. For later analysis with SM2R1 the desired monitoring cycle should be specified as the analysis period.Reduction of the number of objects to be monitored
This reduces the induced system workload, which results in less falsification of the monitored system.
Sufficiently large number of samples
As a rule, this should be implemented not by increasing the sampling rate but by lengthening the monitoring cycle. The sampling rate should be increased only if the system workload permits or if it is not possible to lengthen the monitoring cycle.