Before the Server Unit is switched on, the status indicator lights up green (item 5 in figure 2).
> | As the administrator, BS2000 administrator or a privileged operator, switch on the Server Unit using the SE Manager (menu Hardware |
The power-on indicator lights up green. The Server Unit switches on, conducts a system test and starts X2000.
If automatic IPL is configured for BS2000, the BS2000 system (Native or as a VM2000 monitor system) is also started with the configured settings.
If automatic startup is configured for XenVMs, these systems are also started.